Winter Olympics and Paralympic Games 2010
at Vancouver and Whistler, British Columbia, Canada
Olympic Games: 12th – 28th February 2010
Paralympic Games: 12th – 21st March 2010
The Austria House is constructed as a passive house. The house will have 250 square metres of floor space, and will be a state-of-the-art building using ecological construction materials.The Austria House is constructed using solid wood construction. This is a joint project between the APG, "Quality made in Austria", and the company Dürfeld Log Construction Ltd. at Whistler.